  • EPCC OF ERECTION 3 UNITS OF 2,000 M3 API 650 STORAGE TANKS & CONNECTING PIPING WORKS

  • EPCC – ERECTION OF 7 UNIT STORAGE TANK AT WEST PORT KLANG (KA PETRA GROUP)

  • CONSTRUCTION OF ACID EFFLUENT STORAGE TANK

Civil Work

  • ROADWORKS FOR KUANTAN RESIN PLANT

  • PRR-2 REVAMP CIVIL WORKS (VALUE: RM 6 MIL)

  • RC WORKS FOR COGEN PROJECT AT GPP-A & B

  • KUANTAN RESIN PLANT SITE WIDE CIVIL WORKS

  • CENTRALIZED LABORATORY PROJECT

  • CDU/VDU REVAMP PROJECT

  • MICROPILING WORKS FOR CONSTRUCTION OF NEW SLAB IN METHANOL DYKE AREA AT KUANTAN PORT

  • DYKED STORAGE AREA

EPCC

  • CADANGAN MEMBINA DAN MENYIAPKAN BANGUNAN PEJABAT DAN KILANG ‘OFFSHORE PEDESTAL CRANE’ DI ATAS LOT PT 7358, KAW PERIND TLK KALUNG, MUKIM TELUK KALUNG, DAERAH KEMAMAN, TERENGGANU DARUL IMAN

  • EPCC OF CENTRALIZED LABORATORY FOR NEW RESIN PLANT

Piping Work

  • CONSTRUCTION OF EXTERNAL FIREWATER MAIN PIPING FOR BOTTLE BLOWING PLANT

  • MODIFICATION OF UTILITY PIPING (RETURN LIQUOR & PROCESS WATER)

  • PUMP PU-1119 RELOCATION INCLUDING PIPING & MECHANICAL WORKS

  • PIPING & MECHANICAL WORKS FOR DIAPHRAGM PUMPS INSTALLATION FOR SUMP PITS

Plant Maintenance

  • REPLACEMENT OF COOLER TUBE BUNDLE

Steel Structure

  • FM GLOBAL FIREWATER PUMP HOUSE CONSTRUCTION (IN PROGRESS)

  • PAKA SULTAN ISMAIL POWER STATION AIR FILTER STRUCTURES RE-STRENGTHENING

  • MAINTENANCE PLATFORMS AT GPP A & B